Project(Narrow belt sorting system) Application Number of sorter Deliver date Package type Maximum size(mm) Sorting efficiency
BEST Inc. in Jiaxing Sorted roughly by matrix 1 2017 Large pieces L1200*W800 4000 Pieces/h
BEST Inc. in Zhengzhou Sorted roughly by matrix 22 2018 Large pieces L1200*W800 4000 Pieces/h
DANNIAO in Zengcheng Sorted roughly by matrix 1 2019 Medium and large size package L1000*W800 5000 Pieces/h
EMS in Guangzhou Sorted on the line and loaded 1 2020 Medium and large size package L1000*W800 4000 Pieces/h
One click dialing One click navigation